ALEXANDER COUNTY

\

I-57 Cairo

Job #1704

Alexander County
  • Lane closures on bridge-Please watch for workers

EDWARDS COUNTY

FRANKLIN COUNTY

\

Intersection IL 37 / IL14 in Benton

Job #1712

Franklin County

 

  • Signal work has started, watch for equipment and workers

\

Crocker Road - Resurface NW of Sesser

Job #1721

Franklin County
  • N/A   

\

E St Louis St. - West Frankfort Road Reconstruction

Job #1723

Franklin County
  • Work will begin with tree removal and storm sewer October 30th. The gas company has decided to replace the old gas line with a new one through the entire project. The gas company is currently replacing the gas line from one end of the project to the other.

GALLATIN COUNTY

HAMILTON COUNTY

HARDIN COUNTY

JACKSON COUNTY

\

Giant City Road in Carbondale

Job #1707

Jackson County
  • Temporary signals in place, road is down to one lane for Bridge work.
\

IL 13/127/149 in Murphysboro

Job #1719

Jackson County   Rt. 13/127/149 in Murphysboro
  • N/A  

JEFFERSON COUNTY

\

I-57 North of Ina

Job #1640

Jefferson County
  • I-57 is down to one lane each direction for the next two weeks. Use extreme caution as backups are happening frequently. The driving lanes are closed in both directions.  Merge to the passing lane as soon as you start seeing the construction signs. If everyone would get over and not try to beat someone to the taper, then traffic would flow freely through without any backups. We should be complete with the barriers off and both lanes open around the 21st of this month.
\

RT 15 Woodlawn

Job #1701

Jefferson County
  • Temporary signals in place.  Watch for equipment and workers.
\

IL 15 & N Harmony Lane Intersection

Job #1715

Jefferson County
  • N/A
\

IL 15 / Woodlawn Road Intersection

Job #1725

Jefferson County
  • N/A

JOHNSON COUNTY

MASSAC COUNTY

\

I-24 from US 45 Crossover to Ohio River

Job #1729

Massac County
  • Lane closures east  and west bound are in place until Friday am.  We will be working evenings for the next couple of weeks with lane closures in both directions. Please obey guide signs and slow down through the construction zone. All lanes are open for the weekends. Construction should be complete the week of the 23rd.

PERRY COUNTY

\

Shamrock Road - resurface

Job #1722

Perry County
  • N/A
\

IL 154 in Pinckneyville from Panther Drive to US 51

Job #1735

Perry County
  • N/A

POPE COUNTY

PULASKI COUNTY

RANDOLPH COUNTY

\

IL 150/IL 4 Steeleville Resurface

Job #1705

Randolph County
  • N/A
\

IL 4 N of Sparta - Mill and Resurface

Job #1728

Randolph County
  • N/A

SALINE COUNTY

\

RT 45 Eldorado to Texas City

Job #1448

Saline County
  • Watch for traffic shifts to new lanes beginning Tuesday September 12, 2017. We have shifted to the new lanes. Use extreme caution as traffic patterns are completely different than what has been for quite some time.
\

RT IL 13 East of Harrisburg

Job #1717

Saline County
  • N/A One Lane Road, Flaggers Present, Use Caution.
\

Wasson Road Resurface

Job #1726

Saline County
  • N/A
\

Paulton Road

Job #1737

Saline County
  • Road Closure to begin Tuesday September 19 From Corinth Road to Streetcar Road to make permanent repairs to roadway affected by mine subsidence. Approximate duration 6 weeks.

UNION COUNTY

\

I-57 over RT 146 Interchange

Job #1702

Union County

Proceed with caution as workers are still working overhead of route 146. We poured the deck on the structure and are currently working on the approach slabs and parapet walls on the deck. We are pouring the approach slabs and prepping for the asphalt run offs.

WABASH COUNTY

WASHINGTON COUNTY

WAYNE COUNTY

WHITE COUNTY

WILLIAMSON COUNTY

\

RT 13 From RT 148 To Crainville - Includes : Bridge At Wolfe Creek & Frontage Roads

Job #1419

Williamson County
  •  The earth work is ready for seed. The asphalt and bridge painting are complete. Grass seed and the pavement markings should begin when weather allows. The seeding has begun and all lanes are open.

\

I-57 South of Marion to I-24

Job #1546

Williamson County
  • North Bound Left Lane Closed at the 48Mp, Expect Major Delays, Seek Alternate Routes if Possible. Be Prepared to Stop, Use Caution In Work Zone.
\

RT 13 near Greenbriar Road

Job #1631

Williamson County
  • The south side of 13 boat ramp is about to close for reconstruction. There are a tremendous amount of trucks bringing in aggregate base this week.  Use caution traveling through this area. Paving has begun on the new frontage road and the 10′ sidewalk has started being poured. The new parking lot is in the process of being paved.

 

\

South Market - Reconstruction

Job #1732

Williamson County
  •  The curb and gutter are complete and the aggregate base has been completed. We are currently laying the bricks and starting to pour the driveways. Sidewalks will begin next week.
\

IL 37 over Limb Branch south of Marion

Job #1720

Williamson County
  • Work will begin October 30th after the work on I-57 is complete as we are using route 37 as a bypass in case of emergencies or backups on I-57. Work is set to begin October 30th.

 

\

Russell St in Marion - Pavement Reconstruction

Job #1727

Williamson County
  • Russell street is closed from Scottsboro road to Hill avenue for road construction.

 

construction | construction company | et simonds | paving | careers | road construction | contact
2016 © E.T. Simonds Construction Company, All rights reserved.

HOME       ABOUT        SERVICES        CAREERS        SAFETY        EQUIPMENT FOR SALE        ROAD REPORT        LINKS        CONTACT       GET A QUOTE