ALEXANDER COUNTY

\

RT 3 Thebes

Job #1642

Alexander County
  • Signals are in place and working. Bridge is down to one lane traffic. Replacing expansion joints at both ends of bridge.

\

I-57 Cairo

Job #1704

Alexander County
  • N/A

EDWARDS COUNTY

FRANKLIN COUNTY

GALLATIN COUNTY

HAMILTON COUNTY

HARDIN COUNTY

JACKSON COUNTY

\

RT 51 Dowell

Job #1639

Jackson County
  • Temporary signals in place, road is down to one lane.  Watch for workers and equipment.

\

Town Creek Road

Job #1703

Jackson County
  •  One Lane Road, Flaggers Present, Watch for Workers and Equipment.
\

RT 127 Over Beaucoup Creek - North of Murphysboro

Job #1456

Jackson County
  • Traffic is switched to new alignment on new bridge.  Pay attention to signs and drive slowly.

JEFFERSON COUNTY

\

RT 148 south of Mt. Vernon and Rt 148 near Dix

Job #1611

Jefferson County
  • Road work resumes Thursday  April 27th.
\

RT 37 north of Bonnie

Job #1637

Jefferson County
  • Temporary signals in place, road is down to one lane.  Watch for equipment and workers. 

\

I-57 North of Ina

Job #1640

Jefferson County
  • N/A
\

RT 15 Woodlawn

Job #1701

Jefferson County
  • Temporary signals in place.  Watch for equipment and workers.

JOHNSON COUNTY

MASSAC COUNTY

PERRY COUNTY

POPE COUNTY

PULASKI COUNTY

RANDOLPH COUNTY

\

Kaskaskia and Water Street in Chester

Job #1641

Randolph County
  • Work Starts Week of May 8th
\

Modoc Ferry Road

Job #1643

Randolph County
  • Road will be closed this week for curve realignment.

SALINE COUNTY

\

Bridge on US 45 - 4 Miles South of Carrier Mills

Job #1601

Saline County
  • One lane road with signals in place. Painting the structural steel below deck. Striping and rumble strips are all that is left to do to open after painting.

\

RT34 near Rudement

Job #1610

Saline County
  • The guardrail is complete. we will be linseed oiling the deck next week and seeding if weather permits. We should stripe by the end of next week and open the bridge to 2 lane traffic.

\

RT 45 Eldorado to Texas City

Job #1448

Saline County
  • N/A

UNION COUNTY

\

I-57 over RT 146 Interchange

Job #1702

Union County
  • Passing lanes closed both north and south bound for median cross-over construction. we are widening the median crossovers getting ready to pave them before we can switch traffic all to the north bound lanes. The south crossover is ready for asphalt and the north is still under the widening phase of construction.

WABASH COUNTY

WASHINGTON COUNTY

WAYNE COUNTY

WHITE COUNTY

WILLIAMSON COUNTY

\

RT 13 near Greenbriar Road

Job #1631

Williamson County
  • We finished the loop detectors across all three east bound lanes and the new turn lane last night. The concrete intersection is complete and open as well as the east bound right turn lane.  Still have the striping and earth work to complete for this phase of the job. All lanes are open through this area.
\

RT13 east of Marion near Norman Road

Job #1636

Williamson County
  • May 1st we will begin construction along the north side. Lane closures should begin the following couple of weeks.

\

RT 13 From RT 148 To Crainville - Includes : Bridge At Wolfe Creek & Frontage Roads

Job #1419

Williamson County
  • Briggs road is closed to the south for reconstruction and placement of the third east bound lane on 13. We are erecting the 6 pilasters at the four corners of the bridge and center piers at wolf creek road. We are placing the pavement markings along the frontage roads and wolf creek road and across the bridge. The curb and gutter and driveways are complete on Main street  and next week we will place the final aggregate base and begin the asphalt phase. Earth work and side walks will continue when the rain stops falling.

\

I-57 South of Marion to I-24

Job #1546

Williamson County
  • South bound lane closures  continue through May 25th. Major delays possible, use alternate routes. Be prepared to stop. Use caution,  Entrance Ramp to Southbound 57 and East bound I-24 From Route 148 will be closed May 1st through May6th.
construction | construction company | et simonds | paving | careers | road construction | contact
2016 © E.T. Simonds Construction Company, All rights reserved.

HOME       ABOUT        SERVICES        CAREERS        SAFETY        EQUIPMENT FOR SALE        ROAD REPORT        LINKS        CONTACT       GET A QUOTE